Main sponsors

Riyadh Air Nike

Atlético de Madrid Escudo Atlético de Madrid

The first connecting walkway has been placed between the compression and the traction rings of the Wanda Metropolitano

The walkway between both rings will allow the workers to access the oval that will open above the pitch and where part of the stadium's lighting will be placed. / PHOTO: Alexander Marín
The walkway that connects the traction ring (interior) with the compression ring (exterior) has been placed at the south end of the Wanda Metropolitano. / PHOTO: Alexander Marín
Apart from the two connecting walkways between the rings, which will be placed at the north and south end, there will be also a walkway around the traction ring. It will allow the workers to move around the oval that will be over the pitch. / PHOTO: Alexander Marín
Once the placement of the compression ring membrane is completed, the triangles of the interior ring will then be placed. And afterwards, the radial panels. / PHOTO: Alexander Marín
Spectacular view of the east side's upper stand with the radial cables criss-crossing above the pitch. / PHOTO: Alexander Marín
This is how the field will look from one of the television positions with a view to the field, located at the south end of the Wanda Metropolitano. / PHOTO: Alexander Marín
The installation of the compression ring membrane continues its progress. / PHOTO: Alexander Marín
There will be a second walkway in the north end that will unite the interior and the exterior rings. / PHOTO: Alexander Marín
One of the membrane's radial panels of the roof that will cover the stand, is rolled up over the north end, waiting for the work to be done before its installation to be finished. / PHOTO: Alexander Marín
Detail of the installation of the projection over the roof. / PHOTO: Alexander Marín
View of the Wanda Metropolitano's facade, where the progress of the work done on the west side's projection can be seen. / PHOTO: Alexander Marín

MORE PHOTO GALERIES