Main sponsors

Riyadh Air Nike

Atlético de Madrid Escudo Atlético de Madrid

Great progress in the inside and outside of the Wanda Metropolitano

The Wanda Metropolitano from the southern car park, an amazing view. / PHOTO: Alberto Molina.
The roof looks spectacular from the Avenida de Arcentales. / PHOTO: Alberto Molina.
The painting of the car parks has advanced considerably. / PHOTO: Alberto Molina.
The paving work has begun. / PHOTO: Alberto Molina.
View of the car park from the stand of the south end of the Wanda Metropolitano. / PHOTO: Alberto Molina.
The construction of the roundabouts of the northeast and the southeast that will be joined by a street have progressed considerably in the last days. / PHOTO: Alberto Molina.
In the west area of the stadium, the installation of the red gutter that will distribute the water continues advancing, and on the façade, the installation of the LED curtain structure. / PHOTO: Alberto Molina.
The installation of the membrane over the projection avances in the north end. / PHOTO: Alberto Molina.
Inside the stadium, the painting of the underground car parks have begun. / PHOTO: Alberto Molina.
The levelling works have begun in the tunnel to enter the pitch. / PHOTO: Alberto Molina.
Security at the Wanda Metropolitano will be one of the pillars of the experience. / PHOTO: Alberto Molina.
The ribbon board is almost totally installed. This 360º LED surface will surround the pitch. / PHOTO: Alberto Molina.
The installation of the seats in the ring of boxes and the western middle stand has begun. / PHOTO: Alberto Molina.
The PA system is installed at its final position of the traction ring, over the pitch. / PHOTO: Alberto Molina.

MORE PHOTO GALERIES