From the very top of the Wanda Metropolitano

Assembly process of one of the slats of the traction ring. / PHOTO: Alberto Molina.
Picture taken from the traction ring, where several lights are placed to illuminate the pitch and the lower stand. / PHOTO: Alberto Molina.
View of the upper stand of the west side, in which the installation of the seats is very advanced. / PHOTO: Alberto Molina.
The installation of the projection's upper membrane in the south end of the stadium has begun. / PHOTO: Alberto Molina.
Another perspective of the exterior, with the south car park at the back. / PHOTO: Alberto Molina.
The lighting will be spectacular thanks to Philips Lighting. The Wanda Metropolitano will be the first stadium in the world to be 100% LED. / PHOTO: Alberto Molina.
A crane lifts one of the slats to be placed in the traction ring over the east stand./ PHOTO: Alberto Molina.
Amazing view of the central eye of the roof from the pitch. / PHOTO: Alberto Molina.
Maintenance walkway in the traction ring. / PHOTO: Alberto Molina.
Amazing view from the traction ring. At the back, LG's video scoreboard in the north end. / PHOTO: Alberto Molina.

MORE PHOTO GALERIES

1

2

3

4

5