The Wanda Metropolitano, seen from the air

The installation of the structure of the projection over the main façade is well underway. / PHOTO: FCC
Overhead image of the installation of the projection trusses over the southwest corner. / PHOTO: FCC
The installation of the first of the radial panels over the north end of the Wanda Metropolitano began last Tuesday. / PHOTO: FCC
Overhead view of the first radial panel that covers the stands of the Wanda Metropolitano. / PHOTO: FCC
The work on the traction ring is progressing at a good pace. The walkways are being placed and the triangular panels of the membrane are being installed. / PHOTO: FCC
The design of the roof has been done by the prestigious consulting company schaich bergermann partner. / PHOTO: FCC
The installation of the panels of the membrane in the compression ring, the exterior oval structure of the roof, which lies on the stands of the stadium, is almost finished. / PHOTO: FCC
The membrane of the roof is made up of 720 PTFE panels (polytetrafluorethylene) that will cover an area of 83,000 square metres. / PHOTO: FCC
Two exits of the underground car park in the foreground, with the stadium and the Avenida de Arcentales in the background. / PHOTO: FCC
The convergence of the east side with the south end, with Madrid's skyline in the background. / PHOTO: FCC
Work is also being done in the car park that will be next to the Avenida Luis Aragonés. / PHOTO: FCC

MORE PHOTO GALERIES

1

2

3

4

5