The Wanda Metropolitano continues advancing!

Spectacular view from the side. All the protective plastic covers over the seats have been removed for their numbering. That same process has begun in the lower stand. / PHOTO: Alberto Molina
This is how the LED curtain is being installed. It will have an area of 24x6 metres and is on the west façade. / PHOTO: Alberto Molina
The carpeting in the Neptuno - Atlético de Madrid Premium boxes is advancing nicely. / PHOTO: Alberto Molina
All the protective plastic covers of the seats in the upper stand have been removed. / PHOTO: Alberto Molina
Image of the projection where the south end connects with the east side. / PHOTO: Alberto Molina
Image of the south car park, completely paved and with the zebra crossings painted. / PHOTO: Alberto Molina
Image of the Wanda Metropolitano from the south car park where the parking spaces have been painted and the trees planted. / PHOTO: Alberto Molina

MORE PHOTO GALERIES

1

2

3

4

5